Stamullen Wastewater Pumping Station
David Walsh Civil Engineering Ltd. was awarded this contract under the National Civils Framework (17/204) on behalf of Irish Water/Uisce Éireann.
This project involves the design, construction, testing and commissioning of a new Pumping Station at the existing Stamullen WwTP site and laying approx. 4km of twin rising mains, predominately in public roads to connect to the sewer network at Cardy Rock for onward piping to the Balbriggan WwTP. Notably, the rising main pipework installation involved tunnelling beneath the M1 Motorway and Delvin River.
The project included all Civil, Building and MEICA works including; new control and welfare building, inlet screening, grit removal, forward feed pumping, odour control, flow measurement, new storm and washwater tank construction, provision of ESB power supply, SCADA/Telemetry, etc.