Gowran Regional Water Supply Scheme Upgrade

David Walsh Civil Engineering Ltd. was awarded this contract under the National Civils Framework on behalf of Uisce Éireann.  Construction works started in August 2024 and due for completion in Q1 2026. 

The Project includes the Design and Build of the following: 

  • Construction of a new 1,500m3 per day Water Treatment Plant (WTP)
  • Works include new water treatment building and construction of two new treated water storage reservoirs.
  • Develop 2 new borehole sources and lay rising mains.
  • Pipework modification and upgrades at the existing Butlersgrove Water Tower.
  • The project included all Civil, Building and MEICA works including raw water balancing tanks, cascade aerator, 2-stage pressure filtration system for manganese and iron removal, lamella clarifier and sludge treatment, backwash tank, UV and chlorine disinfection, high-lift pumping, flow measurement, provision of ESB power supply and SCADA/Telemetry.
  • The Project included a 3-month extended Process Proving / Trial Operation period.